Captain's Coaching
Four Days Aboard a 60-Foot Viking Sport Yacht at Jefferson Beach
Bob and Teresa knew the Viking was a step up. Four days took them from slow practice in calm water to anchoring, tender launches and lay-to docking in 15 to 20 knots.

Vessel
Beaux Dacious, 1999 Viking 60' Cockpit Sport Yacht · twin 1,050-hp MAN diesels
Where
Jefferson Beach Marina · Lake St. Clair
Conditions
Fair with light winds days one and two, 15–20 kt wind day three, brisk wind and 1–2' chop day four
The Brief
Bob and Teresa took delivery of Beaux Dacious, a 1999 Viking 60’ Cockpit Sport Yacht with about 2,600 hours on twin 1,050-hp MAN diesels. They knew the boat was a step up. They wanted the whole picture before they ran her seriously, and they wanted both of them to have it, because a boat this size is not a solo operation. We booked four days.
Each morning started with a briefing to lock in what we were going to work on. Day one ran about two hours of that, day two ninety minutes, day three an hour, and day four was more of a rolling conversation while an electrician wrapped up onboard work. I left a full coaching plan on the boat for reference. This is the kind of engagement where moving up to a bigger boat really shows.
Days One and Two: Calm Water, Slow Practice
Warm and light-and-variable both days. Best conditions you can ask for when the point is to feel a boat, not fight it.
We ran a full engine room inspection each morning. Residual oil, fuel, and coolant along the walkway between the engines got cleaned so we could tell whether anything was fresh. The one active leak was water at the port shaft log while underway. The starboard main engine seacock would not close, most likely stuck from lack of operation, and needs to be serviced so it can actually be closed in an emergency. Each engine drank about a quart of oil across the first three days. That was mostly idle and low-speed work, so the number is what it is, but it goes in the log and gets watched.
On the water we worked stopping, rotating, backing down, and lay-to docking against a wall using either a spring line or a bow line. Bow-in and stern-in approaches both directions. The rule was: work through the mistake, recover the boat, and run the maneuver again. Day two we introduced anchoring and setting the bridle. The ground tackle on this boat is heavy, and the first few sets were a reasonable challenge, which is exactly what you want in a coaching setting. We built a safer, more deliberate process out of it. Anchoring on a boat this size is a two-person job, and a lot of what makes the difference is written up in setting anchor without drifting. When heat and bugs took over the lake, we ran back into the marina, worked lay-to at the Watermark restaurant, and took a late lunch.
We also walked through emergency procedures for fire, man overboard, and water intrusion. Roles, communication, and a calm sequence. The First Mate emergency playbook covers most of what we talked through.
Day Three: Wind and Lay-To Docking
Fifteen to twenty knots. The kind of conditions that show you what a 60-foot yacht actually wants to do when you stop paying attention.
A conventional dock departure was not going to work, because the wind wanted the bow before we could get the stern out. Instead we backed the boat out while rotating the stern completely away from the dock, made a controlled 180 in reverse, and drove out of the fairway. It is not what you see most days, and it is the right call in that wind. If you want the reasoning laid out separately, leaving the dock in wind is the article.
Bob brought her back into the marina in the same wind and set up for a lay-to at the Watermark. The exercise was to put the bow to the dock, hold it there while Teresa secured a line to a piling and got it back to the forward cleat, and then walk the stern into the wind. A few coaching corrections and he was repeating it. We added the stern windlass as a second tool for heavy-wind lay-to, and Teresa handled it confidently after a quick walk-through. On one return the anchor made light contact with dock hardware. Nothing dramatic, but we used it. Managing a boat this size is about finesse and controlled momentum, not force, and the way you avoid a repeat is by talking about it out loud right after it happens.
Day Four: Anchor, Tender, and a Broken Davit Button
Quick repair to the anchor from the day before, and we built a quick-release line for the tender. Same stern-rotation departure we used on day three. Once on the lake, Bob worked the foredeck and Teresa ran the helm, kept watch on traffic, and monitored the whole scene. That is the split you want with two people on a boat this size, and they had it by day four.
Anchor set, bridle secured, we launched and retrieved the tender from the bow davit. Brisk wind and one to two feet of chop made the launch honest work, and it was exactly the environment to learn in. Weighed anchor and ran back into the marina for a starboard-side tie against the wall to keep working with the davit. Bob and Teresa put the boat alongside cleanly. Clear communication, appropriate speed, controlled approach. That is what a well-run docking looks like.
Then the davit control box quit mid-exercise. Cracked plastic rib supporting the contact button. We found a spare controller onboard and had it installed in under an hour. Nature of boat ownership. You want to know how to find the spare.
What They Took Away:
Full anchoring sequence including bridle set and weighing
Tender launch and retrieval from bow davit in one- to two-foot chop
Wind-day lay-to docking at 15 to 20 kts, both approach and departure
Emergency procedures reviewed: fire, MOB, water intrusion
Follow-up service items handed to the marina
The Handoff
Bob and Teresa can run this boat together. Four days is a lot to ask of anyone, and they showed up ready to work every day. They came in knowing the vessel was a step up, and they leave with a real feel for how she moves, how she docks, how she anchors, and how the two of them coordinate to make all of that happen without shouting.
There is still a service list. The starboard main seacock. A shore power check. Oil consumption to monitor as the hours build. The kind of thing you expect on a big boat coming out of light use and back into regular operation. We have a plan for it.
If you are taking delivery of a boat this size, this is the way to do it. You do not learn a 60-foot Viking in an afternoon. You learn her over a few days, in a few different conditions, with somebody sitting next to you who has done it. Let’s talk about your boat.

